Contact UsMap ServermyPlanningLogin
Malta Environment & Planning Authority - www.mepa.org.mt
Print Page

HomeSeperatorPermitting and EnforcementSeperatorEnvironmental AssessmentSeperatorPublic consultation

Public consultation

Your views and comments on proposed developments that are undergoing an Environmental Impact Assessment (EIA) process are important.  This section contains a list of proposals that are currently undergoing an EIA procedure, and for which the public is invited to submit comments.

You may send your comments in one of the following ways:

in writing to the following address:

Environmental Assessment Unit
Environment Protection Directorate
Malta Environment & Planning Authority
St. Francis Ravelin
Floriana, Malta

via fax on: 356 2290 2290

via email on: Email-us


 Description

 Link

Closing date 

PA 01191/05 - Construction of a mixed development which includes a) shopping hall, b) commercial areas and residential units c) an underground parking and service facilities, at Old Union Club, High Street, Tigne’ Street, Sliema   Sliema Townsquare EPS Addendum Jan 2012 17/02/2012
PA 02582/07 To rehabilitate quarry for agricultural use, Site at Ta' Habel Lazz, l/o Kercem (Gozo)PDS PA 02582/07 07/02/2012
GF 00121/06 – Master Plan for the Magħtab Environmental Complex, at, Il-Għallies ta’ Ġewwa, Naxxar. 

Master EIS Update 12 09 2011 FINAL

Adi Associates NTS MBT Ghallis EIA 12 09 2011

Technical Appendices

GF_121_06_EIS_Update_Review_Adi Response FINAL

06/02/2012

PA1302/06: Outline development for the construction of maisonettes, apartments, penthouses and underlying garages;

PA1927/06: To construct four apartment blocks to include in total 48 residential units and 48 basement garages and a public area of 350m2;

PA2761/06: Comprehensive development of site B as per approved ‘Ta’ Masrija Planning Policy’.  This includes approx. 300 units with underground parking and tunnel, open spaces, public promenade and neighbourhood centre,

at, Ta’ Masrija, Mellieħa.

00_TaMasrija_EPS2_CoordAss_Print A4 Duplex

01_TaMasrija_EPS2_AppOne_Print A4 Simplex

02a_TaMasrija_EPS2_AppTwoA_Print A4 Simplex

02b_TaMasrija_EPS2_AppTwoB_Print A4 Simplexl

03_TaMasrija_EPS2_AppThree_Print A3 Simlex

04_TaMasrija_EPS2_App Four_Print A4 Simplexl

05_TaMasrija_EPS2_App Five_Print A4 Duplex

06_TaMasrija_EPS2_App Six_Print A4 Simplex

07_TaMasrija_EPS2_App Seven_Print A4 Simplex

08_TaMasrija_EPS2_App Eight_Print A3 Simplex

09_TaMasrija_EPS2_App Nine_Print A4 Simplex

06/02/2012
PA 03761/07 - Sanctioning of jaw stone crusher and area for stock piling, site at Triq il-Hwawar, Ix-Xwieki, L/O Iklin. PDS PA 03761/0730/01/2012

PA 5062/08 To sanction the existing building and convert to a broiler fattening farm, including alterations and extension Site at - Animal Farm, Triq San Leonardu, Xghajra. 

PDS PA5062_08 Farm Xghajra12/12/2011
PA 04906/10 (GF 00117/10): To demolish existing touristic complex, clear site, cut/fill, and construct tourist complex as per development brief for area, at, Hal-Ferh, Golden Bay, Mellieha, Malta.  

A_01_HalFerhEIS_CoordAss_Vol1_A4_Duplex

A_02_HalFerhEIS_CoordAss_Vol2_A3_Simplex

A_03_HalFerhEIS_CoordAss_Vol3_A4_Simplex

B_01 to 03_HalFerhEIS_Appendices (Appendix One - Appendix Three)

A_040_HalFerhEIS_CoordAss_Vol4_A4_Simplex

A_041-046_HalFerhEIS_CoordAss_Annexes1-6

A_050_HalFerhEIS_CoordAss_Vol5_A3_Simplex

 
30/11/2011

PA 00299/05: Erection of multistorey office block including underlying car-parking, business centre/ conference  theatre, at Block T14, Tigne North Phase, Ix-Xatt Ta' Tigne', Sliema, and,

PA 04160/10: Construction of two residential blocks (superstructure only), including catering outlets at ground floor with external seating area.  Construction of north shore beach club, at, Block T17 E & W, Tigne Point, Ix-Xatt Ta' Tigne', Sliema, Malta. 

 

00_MIDI_Tigne_Coordinated Assessment Report

01_MIDI_Tigne_App1_ToR

02_MIDI_Tigne_App2_ZVI

03_MIDI_Tigne_App3_Baselines

04_MIDI_Tigne_App4_1999-Scheme&Landmarks

05_MIDI_Tigne_App4_Photomontages 

25/11/2011
PA 4576/09 - Proposed Coastal Sea Defences including (a) repairs and extension to secondary break water arm at Delimara, (b) Construction of new arm at Ponta tal-Qrejten and (c) formation of breach at Secondary Break water ARM, Delimara Power Station, Delimara, Marsaxlokk.   

PA 4576/09 PDS Main Document (Annex I) 

PDS Annex II 

26/09/2011
PA 4905/10 - Development of coastal defences against wave incidence on shore for Marsalforn Bay including: beach nourishment; construction of groyne; upgrade of storm water channel and
construction of submerged breakwater, at Marsalforn Bay, Marsalforn, Zebbug (Gozo), Gozo. 
 

PA 4905/10 - PDS Main Document

PDS Annex I

PDS Annex II

18/09/2011
PA 4096/08 - It is proposed to construct apartments, parking, natural sea water swimming pool and a roof garden, at Site at Portomaso, Triq il-Knisja, San Giljan.  

PA 4096_08_EIS Update

PA 4096_08_EIS Update_Addendum

14/09/2011
PA 5925/05 - Construction of industrial park in quarry, at Site at, Tal- Qormija, Mgarr.  

EPS Coordinated Assessment (Vol. 1)

EPS Coordinated Assessment (Vol. 2 - 7)

EPS Appendices (App. 1 - 3)

EPS Appendix 4  

12/09/2011
PA 621/05 - Amendment of master plan (Tigne’ North) approved in outline development permit, at Tigne North, Ix-Xatt Ta' Tigne', Sliema.   

00Rev03_MIDI_Tigne_TechRep_A4Normal

01_MIDI_Tigne_App1_A4Normal

02_MIDI_Tigne_App2_A3Normal

03_MIDI_Tigne_App3_A3Normal

04_MIDI_Tigne_App4_A3Normal

05_MIDI_Tigne_App5_A3Normal

06_MIDI_Tigne_App6Rev01_A3Normal

07_MIDI_Tigne_App7_A4Normal

08_MIDI_Tigne_App8_A4Normal

24/06/2011
PA 1191/05 - Construct mixed development which includes a) shopping hall, b) commercial areas and residential units, c) underground parking and service facilities at Old Union Club, High Hallet Street, Tigne’ Street, Sliema.  

1_PA 1191_05 Coordinated Report

2_PA 1191_05 Technical Appendix

3_PA 1191_05 NTS

4_PA 1191_05 Addendum 2010

5_PA 1191_05 Addendum 2010 Appendix 1

6_PA 1191_05 Addendum 2011

01/06/2011

EPD Reports on EIA 

The following section contains a list of development applications for which the Environmental Protection Directorate (EPD)'s Report on the certified Environmental Impact Assessment has been finalised.

You may wish to send any queries on the following:

Environmental Assessment Unit
Environment Protection Directorate
Malta Environment & Planning Authority
St. Francis Ravelin
Floriana, Malta

via fax on: 356 2290 2290

via email on: Email-us


 Description

 Link

PA 3798/02 - Construction of a destination port comprising hotel, yacht marina and tourist village, at, Hondoq ir-Rummien, Qala, Gozo.EPD Report on EIA
PA 6042/08 - It is proposed to construct underground parking and commercial areas at level -1 and below, and commercial areas and office space at level 0 and above at the Mercury House site. This includes the transfer of floor space from Pender Place comprising of 3,501 square metres of commercial floor space from level -1 at Pender Place site to level -1 at Mercury House site, and the transfer of 6,458 square metres from Pender Place site from level 0 upwards, to Mercury House site above level 0.  Restoration and alteration works Mercury House and Cold War rooms shall also be carried out, at, Pender Place Project - Phase 4 (Mercury House Site), Triq Sant Andrija, San Giljan.EPD Report on EIA update
PA 4929/09 - Storm water tunnels and other infrastructural works as part of the National Flood Relief Project (NFRP), with proposals for the areas of Zabbar and Marsascala with a discharge point at Xghajra, as outlined in the Cost-Benefit and EIA studies and Technical Assistance reports and other documents prepared by Politecnica.  Site At, Zabbar ending at, Ta' Barkat, XghajraEPD Report on EIA
PA 5430/02 - Re- location of a kerb - side pump and the change of use of part of existing plant yard into a fuel filling station, works include demolition of existing rooms and their re- location , landscaping of site, cleaning, upgrading of existing yard and to sanction. Site at, Tal-Blata L-Għolja, MostaEPD Report on EIA
PA 00237/07 - Construction of a four lane road from Bieb Is-Sultan to Triq San Rokku i/c/w Smart City Project, Site from Bieb is-Sultan to, Triq Santu Rokku, Kalkara. EPD Report on EIA

PA 00299/05: Erection of multistorey office block including underlying car-parking, business centre/ conference  theatre, at, Block T14 Tigné North Phase, Ix-Xatt Ta' Tigné, Sliema; and, PA 04160/10: Construction of two residential blocks (superstructure only), including catering outlets at ground floor with external seating area.  Construction of north shore beach club, at, Block T17 E & W, Tigne Point, Ix-Xatt ta' Tigne, Sliema.

EPD Report on EIA

Appendix I - Public Hearing Minutes

EIA Terms of Reference

The following section contains a list of development applications for which the Environmental Impact Assessment (EIA) Terms of Reference have been finalised.

You may wish to send any queries on the following:

Environmental Assessment Unit
Environment Protection Directorate
Malta Environment & Planning Authority
St. Francis Ravelin
Floriana, Malta

via fax on: 356 2290 2290

via email on: Email-us

 Description

 Link

PA 4905/10 - Development of coastal defences against wave incidence on shore for Marsalforn Bay including: beach nourishment; construction of groyne; upgrade of storm water channel and construction of submerged breakwater, at Marsalforn Bay, Marsalforn, Zebbug (Gozo), Gozo.

Terms of Reference for Environmental Impact Statement (EIS)

Terms of Reference for Appropriate Assessment

 

EIA Public Consultation Meetings

The following section contains a list of development applications for which a public meeting is going to be held in association with an Environmental Impact Assessment (EIA).  In accordance with the EIA Regulations, 2007 (L.N. 114 of 2007), the public is invited to attend the said meeting(s) and may comment on the environmental impact statement being presented and express their views on the impact of the proposed development.

The next public hearings related to EIAs shall be held as follows:


 Description

 Date/Time and Venue

Closing date
GF 00121/06: Master Plan for the Magħtab Environmental Complex, Site at Il-Għallies ta’ Ġewwa, Naxxar.

Date:  30th January 2012

Venue:  L-Oratorju tan-Naxxar, Triq l-Oratorju, Naxxar.

Time:  15:00 – 17:00

06/02/2012