In the interest of public knowledge and transparency of the planning process, MEPA is hereby notifying the general public about the proposals related to Planning Control applications*. The dissemination of this information is intended for notification purposes and in preparation for the public meeting for MEPA Board consideration. The date of the meeting will be published shortly on the website and press adverts.
PC APPLICATION NO. | DESCRIPTION | WEB LINK |
PC 52/10 | To establish the land use zoning, building height limitation and road alignments for the Area of Containment at Triq l-Imdina, Qormi. | Site Plan Report Map |
PC 27/12 | To establish building height, zoning and road alignment of the Rationalisation Exercise Site. Location: Site at Ta’ Gok/Ta’ Pacokk, Triq Hagret L-Armi, Triq is-27 ta’ Novembru 1678, Xewkija, Gozo. | Site Plan Report Map |
PC 06/09 | Change of zoning from villa area to terrace houses. Location: Site at Marbat street, Swieqi | Site Plan Report Map |
PC 26/12 | To modify the scheme alignments respecting site commitments. Part of the affected area falls within a 2006 Rationalisation of Development Boundaries Site. Location: Sites at Triq il-Girna, Bidnija, San Pawl il-Baħar. | Site Plan Report Map A Map B |
PC 40/11 | To reduce the width of Triq L-Imqades from 10.36m to 6m and include an 8m scheme road between Triq l-Imqades and Triq Sir Temi Żammit. Location: Sites at Triq l-Imqades and Triq Sir Temi Żammit, Mġarr. | Site Plan Report Map A Map B |
PC 21/10 | To establish new street alignment and to form front garden and to shift existing street alignment. Location: Site at Triq ix-Xatt L-Aħmar, Għajnsielem, Gozo. | Site Plan Report Current Proposed |
| | | |
*Planning Control Applications scheduled for a public meeting before the MEPA Board include applications related to: the planning of Rationalisation of Development Boundaries Sites, Comprehensive Planning Areas, minor modifications to subsidiary plans, Partial Reviews to Local Plans, and changes to alignment where MEPA considers it expedient to carry out changes to scheme in the interest of proper planning.