Class 5

  

Development related to public utility services

General Provisions
All permitted structures described below shall be subject to the following (where applicable):
(i) It does not entail additional undeveloped land outside the planned or existing highway boundary;
(ii) It does not entail direct or indirect damage to existing historical buildings or monuments, archaeological features including underground shelters, cisterns or water galleries, rubble walls and natural stone paving; and
(iii) It includes all the necessary measure so that, wherever possible:
(a) Infrastructural services are installed underground without any introduction, installation or attachment of overhead wiring on the site or its surroundings; and
(b) Existing overhead wiring and other infrastructural services currently above ground are relocated underground.

5.1 (i) Repairs to Services 
5.1 (ii)Development below ground level for water supply, sewerage, and laying of pipes and cables
5.1 (iii)Installation of service lines to individual customers 
5.2 (i) Installation of booster stations, valve houses, meter houses and switchgear houses
5.2 (ii)Sewage inspection chambers above ground level
5.2 (iii)Storm water culverts
5.2 (iv)Infrastructural service ducts
5.2 (v) Feeder or service pillars 
 
5.1 (i) Repairs to Services
 
Notification: A notification is not required 

5.1 (ii) Development below ground level for water supply, sewerage, and laying of pipes and cables
Notification: A notification is required in or within 30 meters of scheduled property or designated area  
Fee: €60

5.1 (iii) Installation of service lines to individual customers 
Notification: A notification is required in or within 30 meters of scheduled property or designated area
Fee: €60

5.2 (i) Installation of booster stations, valve houses, meter houses and switchgear houses
Notification: A notification is required in UCA, ODZ and in or within 30 meters of scheduled property or designated area. A DNO is not permitted above ground level in UCA or ODZ. 
Fee: €60

5.2 (ii) Sewage inspection chambers above ground level
Notification:
 A notification is required in UCA, ODZ and in or within 30 meters of scheduled property or designated area.
Conditions and other provisions: Maximum footprint of 1m2 and maximum height 1m  
Fee: €60

5.2 (iii) Storm water culverts
Notification: A notification is required in UCA, ODZ and in or within 30 meters of scheduled property or designated area.
Conditions and other provisions: The development must not involve channelisation of natural watercourses or valley beds. 
Fee: €60

5.2 (iv) Infrastructural service ducts
Notification: A notification is required in UCA, ODZ and in or within 30 meters of scheduled property or designated area.
Fee: €60

5.2 (v) Feeder or service pillars 
Notification: A notification is required in UCA, ODZ and in or within 30 meters of scheduled property or designated area.
Conditions and other provisions: Allow at least 1m of unobstructed pavement width and it does not include poles or masts. 
Fee: €60