Contact UsMap ServermyPlanningLogin
Malta Environment & Planning Authority - www.mepa.org.mt

Print Page

HomeSeperatorPermitting and EnforcementSeperatorDevelopment ApplicationsSeperatorDevelopment Notification Order InformationSeperatorClass 15

Class 15

  

Tented structures

15.1 Erection of tented structures for not more than six months in any one calendar year
15.2 Placing of small tents, tarpaulins or similar structures

15.1 Erection of tented structures for not more than six months in any one calendar year
Notification:
A notification is required in all areas subject to the following conditions:
(a) structure musts of ancillary to the existing use of land or building;
(b) shall not be conducive to unacceptable environmental or visual impact;
(c) shall not impair visibility to road junction or pose a threat to the safety of pedestrians or vehicular traffic;
(d) shall be removed before the expiry of the six month period;
(e) shall not entail direct or indirect damage to existing historical buildings or monuments, archaeological features including underground shelters, cisterns or water galleries, rubble walls and natural stone paving.
Fee: €120

15.2 Placing of small tents, tarpaulins or similar structures 
Notification:
A notification is not required
Conditions and other provisions: Any tents shal not be visible from outside the building and shall not entail damage to historical building.