
Mineral and geological exploration and surveying, and environmental monitoring
13.1 (i) Drilling of boreholes and seismic surveys ►
13.1 (ii) Temporary environmental monitoring stations for not more than one (1) calendar year ►
13.1 (i) Drilling of boreholes and seismic surveys
Notification: A notification is not required but it is not permitted within 30 metres of any part of a residential building or other non-commercial building.
13.1 (ii) Temporary environmental monitoring stations for not more than one (1) calendar year
Notification: A notification is not required subject to the following conditions:
(a) no damage or other significant disturbance to the site or the surrounding environment is entailed;
(b) no material is placed of on garrigue or on exposed rockfaces in manner that could foreseeable result in damage to, or scarring of, the land surface; and
(c) the equipment or station is completely removed and the land is fully returned to its pristine condition once the station ceases to operate.